History

development process

DEVELOPMENT PATH


2024

Planning 200000 tons/year production base, have been put into construction...

2023

The headquarters and R & D center are put into operation, and the production line with an annual output of 6000 tons is put into operation.

2022

A round of financing, the establishment of Zhongke Zhiliang New Energy Materials (Zhejiang) Co., Ltd., the construction of LMFP production line.

2019

The "positive electrode nano-safety additive" product was introduced as an auxiliary additive material for the existing positive electrode system.

2017

Angel round financing, the establishment of Ningbo Zhiliang New Energy Co., Ltd., began LMFP pilot production.

2016

Established Suzhou An Manganese New Energy Technology Co., Ltd. and started LMFP pilot production.

2012

The basic research and development of LMFP preparation technology began in Suzhou Institute of Nano, Chinese Academy of Sciences.

ADDRESS

Address: 536 Zhenghai Road, Ma 'an Street, Keqiao District, Shaoxing, Zhejiang Province

WIRE

Email

New Material New Life


High performance lithium manganese iron phosphate product manufacturer


Copyright©KnowLitech Ltd.  SEO Business License   www.300.cn

Here is the placeholder text

SAF Coolest v1.3.1.2 设置面板PVASX-ZUNE-NDSWE-ZFF

图片ALT信息: Zhongke Zhiliang New Energy Materials (Zhejiang) Co., Ltd.